Halle Bouchayer Viallet
ZAC BOUCHAYER VIALLET - 5 esplanade Andry Farcy
38000
Grenoble, France
Architect
Owner
User
Contact Details
Other Information
Frédéric Marillier - ENERCOOP Rhones-Alpes
Climate Zone H1c
Altitude 384 m a.s.l.
HDD 2897
CDD 128
Conservation Area:
No
Level of Protection:
Year of last renovation:
2016
Year of previous renovation:
2011
Secondary use:
Hotel/Restaurant
Building occupancy:
Permanently occupied
Number of occupants/users:
184
Building typology:
Old industrial hall
Number of floors:
3
Basement yes/no:
Yes
Number of heated floors:
1
Gross floor area [m²]:
0,0
NFA calculation method:
SHON (fr)
External finish:
Exposed stone
Internal finish:
Roof type:
Pitched roof
RENOVATION PROCESS
Architecture
BUILDING DESCRIPTION
State of repair
HERITAGE SIGNIFICANCE
Aim of retrofit
Région Auvergne-Rhône-Alpes
1 esplanade François Mitterrand ,69269 Lyon
Tandem Agence
3 rue Rotrou, 28 100, Dreux
contact@tandemarchitectes.com
Tel.02 37 43 80 15
Axiome
Tel.03.27.96.78.84
SORAETEC BE structure
2 Rue de la Viscose, 38130 Échirolles
RETROFIT SOLUTIONS
External Walls
Stone wall
Stone walls of 60 cm were insulated from the inside with 20 cm of mineral wool.
600 mm
0 mm
13mm
600 mm
200 mm
12 mm
Windows
Aluminum window, double glazing, presence of adjustable sun shades
The windows have been changed, now the windows are aluminum, double glazed, with the presence of adjustable sun shades.
The windows have been changed, the architect's wish was to preserve the image of the industrial hall building with a discreet intervention: creation of spandrels, resumption of existing forms. Technically, the joinery is in lacquered aluminum with thermal break, double glazing and installed in the continuity of the lining. For summer comfort, adjustable sun screens have been installed on the frames of the west and east facades, with solar control glazing in addition.
Existing window type | Aluminum frame |
Existing glazing type |
New window type | French opening window and drop down |
New glazing type | Double |
New shading type | adjustable sun shades |
Other interventions
ROOF
GROUND FLOOR
MEASURES TO INCREASE AIRTIGHTNESS
The light steel roof has been preserved, however 40 cm of cellulose wadding has been added in place of the 10 cm of rock wool.
The roof structure has been preserved, it is an important heritage element of this building.
160 mm
100 mm
160 mm
400 mm
The existing ground was in beaten earth, realization of a paving, a heating floor as well as a waxed concrete.
Rammed earth has been replaced by simple paving, which recalls the original ground.
0 mm
0 mm
0 mm
0 mm
0 mm
0 mm
The overall airtightness level of the building after renovation is very efficient and below the desired objectives. Etude thermique : n50≤0,9 vol/h - Q4Pa-surf≤0,6m3/h.m² Perméabilité testée : n50≤0,69 vol/h - Q4Pa-surf≤0,36m3/h.m²
HVAC
HEATING
VENTILATION
DOMESTIC HOT WATER
Replacement of the oil boiler dating from 1982 with a 40 kW wood boiler located outside the heated volume. Installation of 2 wood pellet boilers - Boiler room in the basement outside the heated volume Emission by low temperature radiators in all rooms in place of old radiators and supply air. Heated floor on the ground floor - low temperature radiators in offices.
New primary heating system | New secondary heating system | |
---|---|---|
New system type | Boiler | Boiler |
Fuel | ||
Distribuition system | Radiating wall | Radiating floor |
Nominal power | 40 kW | kW |
Installation of two double-flow mechanical ventilation systems with an exchanger efficiency of 81% in the offices and the restaurant. Installation of an adiabatic system to reinforce the intervention of occupants on natural ventilation. The principle is to evaporate softened water in the ventilation duct. This system has the advantage of low energy consumption, ease of implementation, and no noise and refrigerant nuisance.
Original roof build-up | New ventilation system |
---|---|
Type ventilation system | Centralized |
Type flow regime | |
Heat recovery | |
Humitidy recovery | |
Nominal power | kW |
Electric power | kW |
Control system |
DHW production by the wood boiler - Presence of a 500 liter tank
New DHW system | |
---|---|
Type | wood boiler |
Hot_water_tank | Yes |
With heat recovery |
RENEWABLE ENERGY SYSTEMS
Biomass
Wood boiler room
Biomass System | |
---|---|
Type | |
Storage size | |
Origin of biomass | |
Overall yearly production | kWh |
Energy Efficiency
Primary Energy 88,6 kWh/m2.y
Consumption_estimation_Before: 374,2 kWh/m2.y
Consumption_estimation_After: 88,6 kWh/m2.y
Primary Energy
Consumption_estimation_Including_DHW: Yes
Consumption_estimation_Before: 374,2 kWh/m2.y
Consumption_estimation_After: 88,6 kWh/m2.y
Internal Climate
Attention has been paid to the acoustics of spaces with work on ceilings, floors and the installation of acoustic baffles.
Costs
Total cost of works excluding VRD € 1,240,000 excluding VAT, i.e. € 1,020 excluding VAT / m² of SHON RT. Public works grants € 97,280 Public aid comes from the Deffibat program by the Rhône-Alpes Region. The amounts of the work for the envelope (roof, walls and carpentry) amounted to € 370,000. The amounts of work for the systems (VMC, Chaudière, etc.) amounted to € 280,000.
1 240 000 € (total)
Environment
building in the city center - pre-existing networks preserved
building in the city center accessible by public transport. Lockers for recharging electric bicycle batteries available at the entrance