Aussergrubhof
St. Nikolaus/Ulten 279
I-39016
Ulten, Italia
architetto
Owner
User
Contact Details
Other Information
Accomodation in holiday apartment possible
Climate Zone F
Altitude 1190 s.l.m.
HDD 251
CDD 114
Conservation Area:
No
Level of Protection:
Year of last renovation:
2014
Year of previous renovation:
1950
Secondary use:
Holiday apartments
Building occupancy:
Permanently occupied
Number of occupants/users:
6
Building typology:
Detached house
Number of floors:
3
Basement yes/no:
Si
Number of heated floors:
3
Gross floor area [m²]:
434,16
Thermal envelope area [m²]:
759,68
Volume [m³]:
1312,65
NFA calculation method:
Useful area (it)
External finish:
Lime plaster and wood panelling
Internal finish:
Rendered, but "Stube" with wood panelling
Roof type:
Pitched roof
RENOVATION PROCESS
Architecture
BUILDING DESCRIPTION
State of repair
HERITAGE SIGNIFICANCE
Aim of retrofit
Dr. Arch. Rinaldo Ruvidotti
Dominikanerplatz 3c, 39100 Bozen, Südtirol, Italien
rinaldo@ruvidotti.com
Tel.0471 973272
RETROFIT SOLUTIONS
External Walls
external wall type 1
external wall type 2
external wall type 3
After removing the panelling, the outer walls of the log house were insulated with 10 cm thick hemp fibre boards on the inside. In addition, a diffusion-open wind paper was installed on the outside to prevent the penetration of driving rain and cooling by wind. A vapour barrier was additionally installed on the inside to protect the construction from damp room air. Finally, the original wood panelling or gypsum fibre boards were installed.
30 mm
140 mm
30mm
60 mm
60 mm
140 mm
An additional lime plaster was applied to the natural stone masonry.
20 mm
840 mm
20mm
840 mm
15 mm
In some places the natural stone masonry was replaced by hollow bricks with insulation due to its poor condition.
25 mm
840 mm
25mm
100 mm
540 mm
15 mm
Windows
larchen wood windows
The original windows were replaced by larchen wood windows with double glazing (insulating glazing).
The windows from the 70s have been partly replaced.
| Existing window type | Casement window |
| Existing glazing type | Single |
| Existing shading type | NA |
| Approximate installation year | 1950 |
| New window type | Casement window |
| New glazing type | Double |
| New shading type | Moveable shading |
| New window solar factor g [-] | 0,62 |
Other interventions
ROOF
GROUND FLOOR
OTHER
MEASURES TO INCREASE AIRTIGHTNESS
The changes to the saddle roof include the installation of a larch wood shingle roof with 16cm rafter insulation over the entire living area. In addition, a dormer window was added for the conversion of the attic into a holiday apartment.
The basic structure of the roof was preserved during the renovation except for the dormer. The energetic values were improved by the insulation.
30 mm
80 mm
20 mm
125 mm
30 mm
160 mm
19 mm
20 mm
The ground floor above the unheated basement was reinforced with Polyfoam insulation and a layer of expanded clay.
By the renewal of the ceiling one ould improve the energetic values.
125 mm
60 mm
60 mm
50 mm
70 mm
40 mm
70 mm
10 mm
Within the scope of the renovation, changes were also made in the following areas: Partially the cold underfloors were renewed and underfloor heating was installed New electrical installations were installed on all floors, including the basement. All water pipes were newly laid. The wooden ceilings were reinforced by replacing no longer load-bearingbeams with new ones and sound-absorbing subfloors were installed. The existing interior walls were removed and rebuilt using dry construction methods. The wooden balconies were repaired by renewing the slatted floor and replacing parts of the railing. Weathered woods in the facade were replaced. The hot water system is connected to the milk chamber, which is in the barn.
By renewing the different areas, the energetic values could be improved.
HVAC
HEATING
DOMESTIC HOT WATER
The tiled stoves are still part of the house, but have been replaced in their pure heating function by a wood chip system. With the underfloor heating and the radiators, it is now possible to heat the entire house and no longer just the parlours.
With the additional insulation of the outer walls, good energy values could be achieved.
| New primary heating system | New secondary heating system | |
|---|---|---|
| New system type | Hackschnitzelanlage | Stove |
| Fuel | Biomass | Biomass |
| Distribuition system | Radiator (floor and wall) | Radiating surface |
| Nominal power | Wärmeleistungsbereich 9,6 - 32kW, Feuerungsleistungsbereich 10,3 - 34,8kW kW | not known kW |
RENEWABLE ENERGY SYSTEMS
Biomass
wood chip plant
In order to preserve the historic cellar as such, a separate underground room was excavated for the wood chip plant.
| Biomass System | |
|---|---|
| Type | Chips |
| Storage size | 51 m³ |
| Origin of biomass | |
| Overall yearly production | kWh |
Energy Efficiency
Voluntary certificates: No
Primary Energy 42,2 kWh/m2.y
Consumption_estimation_After: 107 kWh/m2.y
Primary Energy
Consumption_estimation_Calculation_method: Steady state simulation (e.g. EPC, PHPP)
Consumption_estimation_Including_DHW: Si
Consumption_estimation_After: 42,2 kWh/m2.y
Costs
No information published
No