The “maison Rubens” is a typical middle-class row house from late 19th century, in neoclassical style. It reflects the Belgium bourgeoisie life at this period. House is organized in 3 zones: a main part including reception and living space (2/3) and secondary space for stairs, services and corridors (1/3). It has a heritage interest within its decorated front façade (balcony, ceramic tiles and blue stone) and the stucco ornamentation on the ceiling and cornicing at the top of the wall, as well as its marble mantelpiece. Since 1888 (date of construction) no major renovation had been done. The building was almost in its original condition, but in very bad conservation state. The renovation followed two main goals: i) very good insulation (using bio-based materials) and mechanical ventilation of the whole house while conserving the valuable heritage details. ii) energy consumption below 60 kWh/m²y
Energieeffizienz
45 kWh/m2.y

Klimazone Cfc

Höhe über dem Meer 30 m ü.d.M.

Heizgradtage 5

Kühlgradtage 1

Unterschutzstellung nicht geschützt

Ensembleschutz:
Nein

Stufe der Unterschutzstellung:
NA

Baualter 1850-1899

Letzte Sanierung:
2008

Vorhergehende Sanierungen:
2008

Gebäudenutzung Residential (urban)

zusätzliche Nutzung:
Offices

Gebäudebelegung:
Permanently occupied

Anzahl der Bewohner/Nutzer:
4

Gebäudefläche Nettogeschossfläche [m²]: 239,2

Gebäudetyp:
Terraced

Anzahl der Stockwerke:
3

Keller ja/nein:
Ja

Anzahl der beheizten Stockwerke:
4

Thermische Gebäudehülle [m²]:
373,06

Volumen [m³]:
794,83

NGF Berechnungsmethode:
SHON (fr)

Bauart
Brick masonry wall

Außen:
Rendered

Innen:
Plastered (on hard)

Dach:
Pitched roof

+ MEHR - WENIGER

RENOVIERUNGS-PROZESS

Architektur

BESCHREIBUNG

Typical urban house in a row from the end of 19th century in Belgian cities, in neoclassical style. The house is in a dense area, in a row with building of the same type in the street but it is not listed. Since 1888 no major renovation had been done resulting in a very bad general state. It is almost in its original condition
Städtebaulicher Kontext
the house is in a row with other buildings of the same type. It is located in a very dense urban area near by the city center. The north station is at 1.1km and it is surrounded by a lots of public transports (subway, tramway, bus)

Erhaltungszustand

Erhaltungszustand der Gebäudehülle
The building is almost in its original condition. It is in very bad conservation state
Haustechnische Anlagen vor Sanierung
In this house there is no ventilation system. The heating is base on the fuel system. it combines heating and hotwater

DENKMALWERT

ERHALTENSWERTE ELEMENTE
The character of the house has to be preserve and its typical volume organization. The elements such as ceiling moldings (stucco ornamentation on the ceiling and on the top of the wall), the iron catch window, marble fireplaces and the wooden frame has to be conserved.
Denkmalwert und wie er bestimmt wurde
The heritage values have been assessed based on 4 criteria defined by the Heritage department of Bruxelles-Capitale: Authenticity, Integrity, rarety and representativity and 11 interests. This house has Social interest: It is a typical middle-class house from the end of 18th beginning of 19th century which reflects the type of life of the bourgeoisie at this period. the esthetic/artistic interest is recflected in the decorated front façade, (balcony, blue stone used for the ground floor) and the stucco ornamentation (plaster mouldings on the ceiling and molded cornice marks at the top of the wall) . The architectural interest is the inside volume is organized in 3 zones: a main part including reception and living space (2/3) and secondary space for stairs, services and corridors (1/3) a very typical organization.

Ziel der Sanierung

Renovation
Main goal: better insulation of the whole house but conserving the valuable heritage details using bio-based materials, 2nd goal: decreasing the energy consumption below 60 kWh/m².year
Beteiligte Akteure
Öffentliche Hand
Bruxelles environnement
Avenue du Port 86C 3000 B-1000 Bruxelles
Energieberater
EcoRce
Rue de Fragnée 67A, 4000 Liège
Eingesetzte Software/Berechnungstools
Folgte die Sanierung einer spezifischen Methode? Nein
Energiebilanz PHPP software
Hygrothermische Bewertung no
Life Cycle Analysis (LCA) no

SANIERUNGS-LÖSUNGEN

Außenwände

Front facade

Rear Facade

Front facade

Front façade Inside: partial Internal insulation to keep the stucco ornamentations (moldings on the ceiling and moldings cornice marks)

In order to keep the aspect of the front façade the insulation is from the inside but to conserve the wall and stucco (ceiling and cornice moldings marks) the insulation was only partial with woodfiber panels.

U-Wert (vor Sanierung) [W/m2K]: 0,0 W/m²K U-Wert (nach Sanierung) [W/m2K]: 0,405 W/m²K
Mehr Details
Aufbau Bestandswand
Plaster :
20 mm
Brick :
400 mm
Plaster :
20 mm
Aufbau sanierte Wand
Plaster :
20mm
Brick :
400 mm
Insulation - wood fiber board:
76 mm
Dry-lining - Plasterboard:
10 mm
Rear Facade

Rear Facade: External insulation of the whole facade. Moreover, the window sills in natural stone have been replaced by fine aluminium plate which touch the insulation (XPS panels). the brick chimney have been destroyed above roof level.

no

U-Wert (nach Sanierung) [W/m2K]: 0,297 W/m²K
Mehr Details
Aufbau Bestandswand
Brick - Brick with lime mortar:
400 mm
Plaster - Plaster render inside and a layer or lime render between plaster and bricks:
20 mm
Aufbau sanierte Wand
Other - Render based on siliconate SHK from quickmix :
20mm
Insulation - XPS with a thermal conductivity of 0.035 W/(mK):
100 mm
Brick - Construction bricks with lime mortar:
400 mm
Plaster :
20 mm


Fenster

tradition oak frame window

tradition oak frame window

The windows were replaced with new wooden (oak) ones, almost identical, with the original shape

All windows (frame glazing) have been changed mostly with triple glazing.

Bestandsfenster U-Wert Glas [W/m2K]: 0,0 Neues Fenster U-Wert Glas [W/m2K]: 0,8 Bestandsfenster U-Wert Rahmen [W/m2K]: 0,0 Neues Fenster U-Wert Rahmen [W/m2K]: 1,6
Mehr Details
Fenstertyp Bestand Casement window
Verglasungsart Bestand Single
Verschattung Bestand NA
Ungefähres Einbaujahr 1888
Neuer Fenstertyp Casement window
Verglasungsart des neuen Fensters Triple
Verschattung des neuen Fensters NA
Neuer Energiedurchlassgrad g [-] 0,49

Weitere Maßnahmen

DACH

ERDGESCHOSS

MASSNAHMEN UM DIE LUFTDICHTIGKEIT ZU VERBESSERN

DACH

the pitched roof and flat roofs have been insulated

The bituminous coating of the flat roof has been replaced with new synthetic membrane

U-Wert (nach Sanierung) [W/m2K] 0.228
Mehr Details
Aufbau Bestandsdach
Tiles - teracotta tiles:
200 mm
Other - wooden lath air layer:
400 mm
Aufbau saniertes Dach
Tiles - terracotta tiles:
200 mm
Other - wood-fiber insulating boards (multiplex pannels) with a thermal conductivity of 0.044W/(mK):
22 mm
Other - dry lining: Cellulose flocking insulation ( wood structure) with a thermal conductivity of 0.039W/(mK):
180 mm
Other - smart vapour barrier (Intello Proclimat):
10 mm
Other - plaster pannels:
10 mm
ERDGESCHOSS

The floor between the basement and the ground floor has been renovated, insulated as the the stair case from the basement to the ground floor

The wooden flooring has been conserved on the ground floor and the insulation has been done on the basement side. but unfortunately the arches ceiling in the basement has been hiden by the insulation

U-Wert (nach Sanierung) [W/m2K] 0.191
Mehr Details
Aufbau Boden/Kellerdecke im Bestand
Other - wooden floor:
20 mm
Other - wooden floor:
20 mm
Other - arches made with bricks and stell beam:
100 mm
Other - limewash:
0 mm
Other - wooden floor :
150 mm
Aufbau Boden/Kellerdecke nach Sanierung
Other - wooden flooring:
20 mm
Other - Bricks arches with steel beam:
1 mm
Insulation - Cellulose flocking insulation :
1800 mm
Floor joists - addition of wooden beam with smat waterproofing membrane:
1500 mm
MASSNAHMEN UM DIE LUFTDICHTIGKEIT ZU VERBESSERN

A smart vapour barrier installed on the interior side of the pitched roof, Rear Façade and insulated part of the front façade covered with plaster guaranting wall airtightness, An airtight seal has been added at the entrance door and window frame. in between the basement and the ground floor a vapour barrier installed has been installed

Airtightness (post-intervention) [ach@50Pa] 3.12

HVAC

HEIZUNG

LÜFTUNG

BRAUCHWARMWASSER

HEIZUNG

New gas condensed boiler new ventilation system

most of the heater were conserved

Mehr Details
Heizungssystem nach Sanierung zusätzliches Heizungssystem nach Sanierung
Art der Heizung Condensing Stove
Brennstoff Gas Biomass
Wärmeverteilung Radiators Air
Nennleistung 3.5 à 17.2 kW kW kW
LÜFTUNG

new overflow system

The overflow system involves a lots of ducts. Most of the time their are set inside the suspended ceiling. Because the stucco ornamentation should be conserved the ducts have been placed into the chimney pipe. the air is blown in the room from the lateral side of the chimney toward the external wall to decrease all condensation risk. the ventilation system has been place in the basement and the duct were insulated

Mehr Details
Aufbau Bestandsdach Neues Lüftungssystem
Lüftungstyp Centralized
Type flow regime Overflow
Wärmerückgewinnung Ja
Feuchterückgewinnung Ja
Nennleistung kW
Elektrische Leistung 0,0 kW
Regelung
BRAUCHWARMWASSER

the fluid-circulation system passes through one serpentine in a tank of 300L

no

Mehr Details
Brauchwarmwasserbereitung nach Sanierung
Typ decentral boiler
Brauchwasserspeicher Ja
Wärmerückgewinnung aus Brauchwasser Ja

ERNEUERBARE ENERGIE

Solarthermie

Biomasse

Solarthermie

Installation of 5,4 m² of thermal solar panel which powered the boiler

na

Mehr Details
SolarThermal System
Type Flat collector
Collector area 5,4 m²
Elevation angle 37,0
Overall yearly production 0,0 kWh
Biomasse

wood stove

na

Mehr Details
Biomass System
Type
Storage size
Origin of biomass
Overall yearly production kWh

Energieeffizienz

Energieeffizienz
Energieausweis U average = 0,70 W/m²K
Freiwillige Zertifikate Nein
Energievrabrauch
Heizung
Primärenergie 16983 kWh/y
Energieverbrauch nach Sanierung 45 kWh/m2.y

Primärenergie
Berechnungsmethode Steady state simulation (e.g. EPC, PHPP)
Energieverbrauch nach Sanierung 16983 kWh/y
Gemessene Parameter
Bauteile
Type_of_monitoring: Continuous

Kosten

Finanzielle Aspekte

The owners have received subsidies for the total renovation. "energy premium and renovation premium" from government.

Investitionskosten
Total investment costs
1175 euros/m² eurosexcluding VAT (per m2)
Amount includes: it includes all the construction (materials/landscaping/realization) and conception (5000euros excluding VAT) 100euros/m² have been subsided by brussels environnment

Cost of energy related interventions:
75000 euros excluding VAT (total)
Amount includes: it includes the interior and exterior insulation, the windows, the roofs (flat and pitched) the solarfocus boiler, the gas condensing boiler (Vitodens 300W), the ventilation (Aerosilent van Drexel und Weiss) and monitoring. This amount represents 1/3 of the total budget

Umwelt

Water Management